PERMITTEE IS REQUIRED TO CALL NYCDOT HIQA OFFICE AT 212-839-2430 TO SCHEDULE THEIR RE-DIG. CONTAINMENT ONLY TO RESTRICT PARKING AND FOR STORAGE OF EXCAVATED MATERIAL/FILL. A full review will typically take between one or two business days. USE OF METERED,AUTHORIZED PARKING AND NO STANDING ZONES IS PROHIBITED. INTRES-RESTORE AS PER SKETCH #7 OF DOT'S PROTECTED STREET RESTORATION REQ'MENTS. Part II: 619 Standard Sheets | Department of Transportation Name, address and phone number of excavator, Brief description of the planned digging and excavation. Office hours: 8:30 AM-5:00 PM, Queens Applicants must first submit an Emergency Street Opening Permit Form. NYPD AGENTS AND VMS BOARDS REQUIRED AS PER MEC01-36. PERMITTEE SHALL NOT MOVE, DAMAGE OR DISRUPT THE BENCH. The full list of rules and regulations is contained in the Highway Rules, Sections 2-02 and 2-04, and should be consulted before any work is performed on the street. Provide an unobstructed clear path of 8 feet or one half the sidewalk width (whichever is greater) in commercial, high-density residential, and transit-adjacent areas Sidewalks in low-rise residential areas should be at least 5 feet wide Wherever possible, sidewalk cross-slope should not be greater than 2% The applicant will also be notified of any corrective action necessary and recourses available. When the license is issued, the applicant must pay a one-time license fee of $2 per square foot. For complete NYC DOT requirements regarding the performance of work in the street, please consult the Highway Rules and NYC DOT specifications. Street resurfacing in progress. 8:30 AM to 4:30 PM, Lower Manhattan (south of Canal Street) Permits reissued after three business days must be subject to the full permit fee. Further information on responding to Orders may be found in the Highway Rules, Section 2-02(e). Click here to download. The Guarantee Period is considered to be three years on unprotected streets, and up to five years, but at no time less than three years, on protected (recently resurfaced or reconstructed) streets commencing on the restoration completion date. Sub title REVISED DRAWINGS COVERING PEDESTRIAN RAMPS Agency Design and Construction, Department of (DDC) Additional creators DDC & DOT Subject Traffic Safety Transportation Streets and Highways Report type Email: DOT.TrafficElectrical@ct.gov, IES classification of lighting based on its photometric properties. Tel: 718-780-8280 Insurance and Permit Bonds After initial registration, active permittees must submit proof of all insurance and bonds annually. The contact information and hours of operation for all Permit Offices can be found in Appendix C, NYC DOT Contact Information. SECTION24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. The way street work is executed impacts vehicular and pedestrian movement, the useful life of the street surface, and the experience of the street as a public space. PHONE#508-429-6023. Office hours: 8:30 AM-4:30 PM, Staten Island SPEED REDUCERS ARE PROPOSED FOR THE ROADWAY OF YOR WORK AREA. IF RENEWED OR REISSUED, THIS PERMIT SHALL NOT BE PLACED ON HOLD. DOT uses higher wattages on wide or commercial corridors and lower wattages on narrow or residential streets. VMS BOARD MUST BE REMOVED UPON COMPLETION OF THE APPROVED CLOSURE. CONTRACTORS SHALL NOTIFY POLICE, FIRE, EMS, COMMUNITY BOARDS, AND ABUTTING PROPERTY OWNERS 48 HOURS PRIOR TO CONSTRUCTION. YOU MUST SURVEY THE SITE. Who has been found liable by a court or in a proceeding before the ECB of a violation of a rule or order of NYC DOT or the terms or conditions of a permit issued by NYC DOT or other applicable law, which violation caused an imminent peril to life or property. Some of the features on CT.gov will not function properly with out javascript enabled. Only in circumstances where the applicant can demonstrate that the work could not have been reasonably anticipated prior to the street resurfacing/reconstruction will an application for a Street Opening Permit on a Protected Street be reviewed. THIS APPLIES TO PERMITTEES AND ALL OF THEIR SUBCONTRACTORS. The applicant may apply directly for this permit type without being a registered permittee, provided he or she can demonstrate proof of required insurance. Cobra Head fixture on standard lamppost This chapter, which constitutes the current DOT Street Lighting Catalogue, outlines options for street and pedestrian lighting for New York City streets, bikeways, pedestrian bridges, pedestrian malls, plazas, and parks. STREETBOND COLORANT IS ADDED TO PROVIDE COLOR. Once Finance contacts HIQA, the hold(s) will be released. ONLY FOR CORRECTIVE ACTION FOR SPECIAL EVENTS. First, the applicant must obtain authorization from the Highway Inspection and Quality Assurance (HIQA) unit for the placement of the canopy at the proposed location. THIS PERMIT IS BEING ISSUED WITH UNDERSTANDING THAT THE PERMITTEE IS RESPONSIBLE FOR BLOCK SEGMENT CURB TO CURB RESTORATION AS AGREED TO WITH THE BOROUGH ASHO'S OFFICE. Full Closure Review (FCR) hold An FCR hold is automatically placed on the 90th consecutive calendar day of any full street closure. See the state links below for available standard drawings. Note: All distances indicate measurements from nearest edge of any object to closest edge of vault. Transformer vaults are typically installed, owned and maintained by an electric utility company. (718) 391-1958 THIS PERMIT IS BEING ISSUED WITH THE UNDERSTANDING THAT THE PERMITTEE IS RESPONSIBLE FOR RESTORATION OF CUT CONFINED TO WITHIN 8 FEET OF THE CURB LINE IN ACCORDANCE WITH NYCDOT RULES AND REGULATIONS FOR PROTECTED STREETS. City streets facilitate the movement of pedestrians, transit riders, motorists and cyclists as well as the delivery of goods and services throughout the city. For further information regarding fees, the applicant should refer to Section 2-03 of the Highway Rules. Customer Service: (718) 802-3675, Manhattan This list is provided as a reference tool, for informational purposes only, and is not an exhaustive list. Upon completion of this action, the hold(s) will be released. The first option (see Diagram 1) is by using the DOT on-line NYCStreets Permit Management system. The applicant can also request a new vault license for an existing vault by submitting SCARA plans and make a one-time license fee of $2 per square foot. Building Operations/Construction Activity Permits apply to construction activities that take place within the street and are generally associated with construction work adjacent to the street. Each applicant must obtain and provide Worker's Compensation insurance in accordance with the laws of the State of New York from a licensed insurance company. Similarly, the sooner a potential street excavator knows about NYC DOT's intent to work in a particular location, the better it can make arrangements to avoid or reduce potential conflicts. CTDOT_Traffic_STD.zip There are separate permit applications for governmental work, Canopy Permits, and permit renewals and re-issuance, all of which are explained later in this chapter. All Street Opening permit types usually allow for work within 300 linear feet by a width of 12 feet. It draws from a wide range of resources and experience to present a coherent set of choices for street design. Share long-term capital plans for planned repairs, upgrades and new CANNOT WORK WHEN GOWANUS EXPRESSWAY HAS MORE THAN 1 LANE CLOSED SOUTHBOUND. Atransformer vaultis a subsurface structure or room that houses electrical transformers and appurtenant equipment. Appendices to the Street Works Manual provide additional resources, including a list of common permit types and the supporting documentation required for each permit type, reference copies of applications and required forms, contact information for NYC DOT and other agencies and utilities, a list of the stipulations placed on permits under certain conditions and/or at certain locations, and useful internet links by chapter of the Manual. 22 Reade Street, 6th Fl. In order to apply for an embargo waiver, a Request for Roadway/Sidewalk Permits during Embargo Periods form must be submitted for review and consideration to the Permit Office. If the applicant intends to do work associated with a Franchise, Concession or Revocable Consent Agreement, the applicant must have a copy of the Agreement prior to applying for a permit. New York, NY 10007 In-person applications for non-emergency work, including work on all streets in Manhattan and on all critical streets in Brooklyn, Queens and the Bronx; all work to be performed for sewer and water system construction; and all capital project work, all utility work, all crane requests, and all full closures of sidewalks and roadways must be submitted to the central Permit Office in Manhattan. Doing Business with NYSDOT - (business-center) > Engineering > CADD Info > Drawings > Standard Sheets (US Customary) > 619 Work Zone Traffic Control 619 SHEETS EFFECTIVE BEFORE LETTING OF MAY 1, 2022 ARE AVAILABLE IN THE TABLES BELOW Notes: 1. A Full Closure Review (FCR) hold is triggered when a street is closed for 90 days. These are in addition to the "Common Requirements" listed at the beginning of this section. THIS PERMIT INCLUDES THE OCCUPANCY OF THE ROADWAY AND OR SIDEWALK BY BARRIERS FOR THE PURPOSE OF SAFETY AND PROTECTION SURROUNDING THE OPEN UTILITY COVER WHILE MAINTAINING A SHUNT. Applicant Information (Corporation, LLC or LLP), 1C. If there is a hold during the processing of the permit, the applicant is notified of the type of hold and the steps to take to release the hold. Incorrect Information on File If a permittees 24/7 phone number, address or other contact information is inaccurate or has changed without being updated, all future permit requests may be placed on hold until the information is updated. WORK 7 PM FRIDAY TO 6 AM MONDAY AND 7 PM-6 AM WEEKNIGHTS. MAINTAIN 1 - 11 FOOT LANE FOR 2 WAY THRU TRAFFIC W/FLAGGERS AT EACH END OF WORK ZONE. An Occupancy of Roadway Permit is required for closing all or part of one or more lanes of roadway and/or during blasting operations. View the most recent version of Drawing #H1029 of the NYC DOT. Applicants must be registered with NYC DOT and have a Permittee ID Number, except in the case of a Sidewalk Repair Permit taken out by a homeowner, where the work will be performed by the homeowner. Brooklyn, NY 11202 Immediately upon completing the compaction of the backfill of any street opening/excavation, a temporary pavement of an acceptable asphalt paving mixture not less than 4 inches thick after compaction must be installed flush with the adjacent surfaces; or, If plating or decking will be used, the size of the plate or decking must extend a minimum of 12 inches beyond the edge of the, Permanently Restored Opening / Excavation. Vault (VLT) hold A VLT hold is automatically placed if the proposed permit work is for the installation or repair of a vault, which must be reviewed and released by the Permit Office. Sidewalk flagsMust be 5'x 5' where feasibleAll flags containing substantial defects as defined in the Highway Rules must be replaced; patching of individual flags is not permitted. Registered Permittees may apply, pay for and print their permits anytime anywhere using the NYCStreets Permit Management online system. With over 185,000 corners, the Pedestrian Ramp Program is a robust program focused on installing and upgrading pedestrian ramps (curb ramps) throughout the five boroughs. Upon a satisfactory inspection, the hold(s) will be released. Manhattan check-in window hours extended to 3:30pm for Bronx work only. Additionally, in the middle of each fiscal year, the New York City Department of Design and Construction (DDC) convenes a meeting with other agencies and utilities to discuss city projects under its purview that are expected to begin construction during the next four years. If it is determined to be unfeasible, the pending permit will be rejected. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. WHEN SCHOOL IS OUT MAINTAIN ONE 11 FOOT LANE FOR THRU TRAFFIC 7 AM TO 6 PM MON. Applicants who prefer to apply in person may do so using an Application for Roadway/Sidewalk Permit(s)or seeAppendix B, Forms. NO NOISY OPERATIONS BETWEEN 12:01 AM AND 7:00AM. PERMITTEE IS PARTICIPATING IN CORE DRILLING PILOT PROGRAM. (718) 391-1008 CONTAINER SHALL NOT BE STORED OR PLACED WITHIN: (I) "NO STOPPING","NO PARKING ANYTIME" OR "AUTHORIZED PARKING" AREAS. If the installed canopy fails final inspection, HIQA will reject the canopy maintenance permit and notify the applicant of the rejection. This category also covers installations above the street such as banners and decorative lights and permanent installations on the street such as bike racks. Street Works Manual MAY ALSO CLOSE SIDEWALK ON NORTH SIDE FRONTING DEVELOPMENT. FULL CURB LANE RESTORATION WOULD BE REQUIRED FOR 8' WIDTH OF CURB LANE AND THE LENGTH OF ALL CUTS PLUS ANY LL14 CUTBACKS. PRIOR TO BEGINNING ANY WORK, TO ENSURE THAT YOU RESTORE THE AREA IN-KIND, YOU MUST CONTACT THE NYCDOT TRAFFIC OPERATIONS DIVISION TO OBTAIN THE RESTORATION PLANS FOR THIS ROADWAY INCLUDING COLOR MARKINGS AND ANY OTHER INSTALLATION REQUIRED. The NYC DOT Bureau of Permit Management and Construction Control (the Bureau) is responsible for overseeing all construction-related permitting. Listed in the table are the most commonly requested Sidewalk Construction Permit types, which may be used when completing an application. A copy of the form can also be foundin Appendix B, Forms. MANTAIN 1 13 FOOT LANE EAST BOUND, 1 15 FOOT LANE WEST BOUND. Department of Transportation USE OF NO STOPPING ZONES, NO STANDING ZONES AUTHORIZED PARKING, DIPLOMAT PARKING AND TAXI ZONES IS PROHIBITED. To release a POL hold, the Division of Traffic Operations, Office of Street Lighting must be contacted. The construction of any vault that extends beyond the curb must be authorized under a revocable consent agreement, as required in Section 2-13(c) of the Highway Rules, in addition to approval by PEU. An EAN is required for each utility access cover opening at a location, provided that the work is performed around the clock until the emergency is eliminated, at which time the EAN expires. IF MORE THAN 50% OF THE SIDEWALK FRONTAGE IS AFFECTED THE ENTIRE SIDEWALK MUST BE REPLACED WITH THE NEW 4.13C STANDARD. Fax: 718-556-7305, The Bronx Manuals and Standards | Ohio Department of Transportation ALL CLOSURES ARE CONFINED TO 15 FEET TO THE NEW EAST CURB LINE. The Emergency Street Opening Permit Number must be available at the site and presented to any governmental employee upon request. MAY STORE TOOL CART IN PARKING LANE DURING NON-WORKING HOURS. WORK SOUTHBOUND ONLY. 30-30 Thomson Avenue, 4th Floor Additionally, High Density Polyethylene (HDPE) conduit, a more cost-effective material that is not susceptible to corrosion from residual salt water after storm surge events, is replacing galvanized steel for all signal locations and street light locations in flood-vulnerable areas. Municipal Building Some of the activities covered include placement of materials, equipment and temporary structures on the street or movement of construction equipment across roadways and sidewalks. ALL WORK OPERATIONS MUST BE RESTRICTED WITHIN 11 FEET OF THE NORTHWEST QUADRANT OF THE INTERSECTION. Permits may be voided and reissued only within three business days of issuance. Customer Service: (718) 816-2300, The Bronx THIS PERMIT IS BEING ISSUED WITH THE UNDERSTANDING THAT THE PERMITTEE IS RESPONSIBLE FOR BUILDING LINE TO BUILDING CURB TO CURB RESTORATION AS AGREED TO WITH THE BOROUGH ASHO'S OFFICE. 120-55 Queens Boulevard See Section 3.5.1 Holds for more information. Links were last checked January 2023. IF WORK IMPACTS ON THE BENCH, THE PERMITTEE MUST CONTACT NYC DOT AT 212-839-6569 OR VIA EMAIL AT, IF WORK IS AFFECTING A BIKE ROUTE/LANE, CONTRACTOR MUST POST ADVANCE WARNING SIGNS 350' & 200' PRIOR TO WORK ZONE "CONSTRUCTION IN BIKE LANE AHEAD PROCEED WITH CAUTION" AND ALSO POST SIGN AT WORK ZONE "CONSTRUCTION IN BIKE LANE,PROCEED WITH CAUTION". The goal of advance coordination is to reduce the number of excavations in New York City streets. APPROVAL FROM NYCDOT HIQA BOROUGH OFFICE IS REQUIRED BEFORE WORK COMMENCES. THIS PERMIT ONLY ALLOWS FOR THE CLOSURE OF A ROADWAY OR SIDEWALK AS STIPULATED. OR PUBLIC PARK WRITTEN APPROVAL FROM CITY OF NEW YORK PARKS AND RECREATION IS REQUIRED. If no changes are required, the permit will be released. Standard Sheets are available both in the US Customary units accessible below and in Metric units. The full list of Canopy Permit types is shown in the table. CONTRACTOR/PERMITTEE IS REQUIRED TO POST AND MAINTAIN ADVISORY SIGNS A MINIMUM OF48 HRS PRIOR TO CHANGING EXISTING PARKING REGULATION SIGNS TO APPROVED TEMPORARY CONSTRUCTION PARKING REGULATION SIGNS. THIS SEGMENT IS PARTIALLY DESIGNATED LANDMARK. The concrete base must be restored at the same grade as the existing base; at no time may it be brought up to the asphalt course unless authorized by NYC DOT. While the situation is evolving, the agency remains committed to applying the principles and proven treatments included in the Street Design Manual to support the health and safety of all New Yorkers. WORK SATURDAY AND SUNDAY. THIS PERMIT ALLOWS FOR INSTALLATION OF TEMP ROADWAY/PAVEMENT MARKINGS AND/OR TEMP CONSTRUCTION REGULATORY SIGNS AS PER APPROVED MPT PLANS. (See Chapter 4, Section 4.5 Street Construction Inspections and Enforcement regarding the circumstances in which CARs may be issued.). Special and separate procedures govern emergency work: one for utility access covers (including those for "manholes," valve covers and grates) and one for street openings/excavations. Tel: (212) 788-6600, New York City Landmarks Preservation Commission (LPC) Programming activates roadways, sidewalks,and pedestrian plazas, andis essential to the ongoing success of any public space. Listed in the following paragraphs are some of the requirements for canopy authorizations and permits. Canopy permits are not transferable from person to person or from the location of original issue. United States Department of Transportation, Book of Standards for Highways and Incidental Structures, Construction and Traffic Standard Details, Design Standards and Specifications Drawings, PDF, DGN (freely available login required), PDF, DGN (individual division details also available). Enter all persons authorized to obtain permits for the applicant, their affiliation to the applicant and their telephone number and email address. DO NOT PLACE ON MTA/NYCT ANTENNA POLES. However the permit window remains open until 3:15 PM to pick up permits. IF LOCATION IS IN SCHOOL ZONE AS SPECIFIED IN SCHOOL STIPULATION, MAY ONLY WORK 9 AM TO 2 PM MON TO FRI WHEN SCHOOL IS IN SESSION (083 STIPULATION). FULL CORNER QUADRANT RESTORATION IS REQUIRED FOR ALL CORNER QUADRANTS EXCAVATED. TWO SPEED REDUCERS ARE LOCATED IN THE ROADWAY OF YOUR PROPOSED WORK AREA. Queens 619 Work Zone Traffic Control - New York State Department Of Transportation SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN, ALL TEMPORARY TRAFFIC CONTROL DEVICES, INCLUDING BUT NOT LIMITED TO SIGNS, CHANNELIZING DEVICES, FENCING AND MARKINGS SHALL BE PROVIDED, INSTALLED, MAINTAINED AND REMOVED BY THE PERMITTEE IN ACCORDANCE WITH THE MOST RECENT VERSION OF PART 6 OF THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS (MUTCD). Additional information regarding embargo periods is provided in Chapter 3, Section 3.6.2. 8:30 AM to 4:30 PM, Brooklyn The Street Works Manual is a tool intended to increase the performance of both city government and the private sector in this regard. THIS STIP IS USED FOR BPP PLANS AND REQUIRES THE CONTRACTOR TO RESTORE HALF THE ROADWAY PLUS 5'. See the Highway Rules, Section 2-02(j). After the canopy passes final inspection, HIQA will release the hold and the applicant must return to the Permit Office to obtain the permit to maintain the canopy. A full sidewalk accommodates both pedestrian traffic and a range of street furnishings and fixtures. Keywords: Portable, Sign, Support, Temporary, Wooden, Keywords: Portable, Temporary, Rumble Strips, Keywords: Closure, Encroachment, Lane, Mowing,Shoulder, Special, During the processing of the permit, if there is a hold, the applicant is notified of the type of hold and the steps the applicant must take to release the hold. This Manual was created and published by the NYC Department of Transportation (NYC DOT) with contributions from a wide array of professionals from city government and the design field. Street lights and signals at corners must be sited so that they do not obstruct pedestrian ramps, ensuring sufficient access to the sidewalk for all pedestrians, including those using mobility devices. OCCUPY 12 FOOT WIDTH OF ROADWAY. TO FRI. OTHER TIMES OCCUPY 11 FEET ADJACENT TO SOUTH CURB ONLY. During the final design stage of a city project, DDC will also hold a series of alignment meetings with the utilities and other agencies to inform them about proposed changes to the location of street infrastructure that would require facility relocation. 42 Broadway ALL WORK MUST BE PREAPPROVED BY LANDMARK PRESERVATION COMMISSION. (If the homeowner is using a contractor, the contractor must be registered with NYC DOT and must take out the permit.) This information should be used to plan work before streets go into protected street status. NO WORK SHALL BE PERFORMED UNDER THIS PERMIT UNLESS ACCOMPANIED BY AN ACTIVE TYPE 208 & 215 PERMIT. Some of the requirements include, but are not limited to the following, where the applicant must: New York 811 is a nonprofit organization that acts as a communications link between utility companies and individuals planning any digging activity in the five boroughs of New York City and Nassau and Suffolk Counties on Long Island. SECTION24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. Section 3.5 Other Provisions Pertaining to Permits contains more information on holds. CPO holds will typically be released by DDC if the proposed work does not interfere with its schedule. The NYCDOT Standard Details of Construction have been updated to include the revised H-1011 drawings covering pedestrian ramps. Call before you dig. Chapter 4 describes the processes for executing work in the streets, after permits and approvals are obtained, and the enforcement actions NYC DOT may take to safeguard city streets. NYC DOT's mission is to provide for the safe, efficient and environmentally responsible movement of pedestrians, goods, bicycles and vehicular traffic on the streets of the city of New York. NO WORK IS TO BE PERFORMED WITHIN A BLOCK FRONTING A SCHOOL INCLUDING INTERSECTIONS FOR ONE HOUR PRIOR TO SCHOOL START TIME THROUGH ONE HOUR AFTER END OF SCHOOL TIME. Tel: (718) 390-2080, The Bronx If guide sheets are to be included in a project, they should be included in a subset under that project. Staten Island, NY 10301 3. Tel: (718) 298-7300 For questions, Monday to Friday from 8:30 AM until 5:00 PM. POST SIGNS MEETING NYCDOT SPECIFICATIONS FOR DIRECTING PEDESTRIANS TO OPPOSITE SIDEWALK. THIS STIP IS USED FOR WORK CROSSING THE ROADWAY OR FOR BPP RESTORATIONS THAT FALL OUTSIDE OF THE HALF PLUS FIVE RULE. Questions regarding permit registration or application processes can be directed to any Permit Office. NO LANE CLOSURES PERMITTED TWO HOURS PRIOR TO BARCLAYS CENTER EVENTS THROUGH TWO HOURS AFTER THE EVENT HAS ENDED. Brooklyn, NY 11201 211th Street and 23rd Avenue, Queens Riverside Drive, Manhattan Benefits Enhances pedestrian safety and accessibility by reducing crossing distances and providing refuge for pedestrians to cross road in stages Calms traffic, especially left turns and through-movements, by narrowing roadway at intersection The permit to maintain the canopy will remain on hold until after the canopy is installed and inspected. THIS PERMIT REQUIRED AN ODV PERMIT WHICH MUST BE IN THE VEHICLE FOR INSPECTION BY A POLICE OFFICER AND OR AUTHORIZED GOVERNMENTAL EMPLOYEE UPON REQUEST. PERMITTEE IS REQUIRED TO OBTAIN PLAN APPROVAL FROM DOT/PERMIT MANAGEMENT ENGINEERING REVIEW AT 212-839-9666, NYC ADMINISTRATIVE CODE, 19-142, WORKERS ON EXCAVATIONS: A PERSON TO WHOM A PERMIT MAY BE ISSUED, TO USE OR OPEN A STREET, SHALL BE REQUIRED, BEFORE SUCH PERMIT MAY BE ISSUED, TO AGREE THAT NONE BUT COMPETENT WORKERS, SKILLED IN THE WORK REQUIRED OF THEM, SHALL BE EMPLOYED THEREON, (CONT. It provides both a thorough update to the guidance in previous iterations and a number of important additions: a new chapter on public programming in streets and public spaces; a host of new entries throughout the Process, Geometry, Furniture, and Landscape chapters; and substantially expanded coverage of several key topics, including bike lanes, inclusive design, and landscape selection and management. Sidewalk Construction Permits are designated as the "04" permit series, meaning all permits in this category begin with "04". The suspension does not apply to emergency authorizations and permits (see Section 3.6.1 Emergency Utility Access Cover Openings and Emergency Street Openings). New York State Code of Rules and Regulations, Laws of New York(use this webpage to search for the below laws), Administrative Code of the City of New York, Zoning Resolution of the City of New York, American Association of State Highway and Transportation Officials (AASHTO), Institute of Transportation Engineers (ITE), National Association of City Transportation Officials (NACTO), NYC Department of Design and Construction, NYC Department of Environmental Protection, NYC Mayor's Office for People with Disabilities, NYS Department of Environmental Conservation, Downtown Brooklyn Traffic Calming Study (NYC DOT: 2004), Project Development & Design Guide (Massachusetts Highway Department: 2006) [PDF], San Francisco Better Streets PlanDraft for Public Review (City and County of San Francisco: June 2008), Smart Transportation Guidebook: Planning and Designing Highways and Streets that Support Sustainable and Livable Communities (New Jersey DOT/Pennsylvania DOT: 2008) [PDF], Parks, Plants, and People: Beautifying the Urban Landscape (Lynden B. Miller: 2009), Trees in the Urban Landscape: Site Assessment, Design, and Installation (Nina L. Bassuk and Peter J. Trowbridge: 2004), Permeable Interlocking Concrete Paver (PICP), Manual on Uniform Traffic Control Devices (MUTCD), National Historic Preservation Act, Section 106, New York State Department of Environmental Conservation (Title 6), New York State Environmental Quality Review Act (SEQR), New York State Historic Preservation Act, Section 14.09, New York State Department of Transportation (Title 17), A Policy on Geometric Design of Highways and Streets, 7th edition, A Guide for Achieving Flexibility in Highway Design, Guide for the Planning, Design, and Operation of Pedestrian Facilities, Guide for the Development of Bicycle Facilities, 4th edition, BIKESAFE: Bicycle Countermeasure Selection System, PEDSAFE: Pedestrian Safety Guide and Countermeasure Selection System, Designing Sidewalks and Trails for Access, Public Involvement Techniques for Transportation DecisionMaking, MUTCD (Manual on Uniform Traffic Control Devices), Roadside Best Management Practices that Benefit Pollinators, Designing Walkable Urban Thoroughfares: A Context Sensitive Approach, The Design and Safety of Pedestrian Facilities, Accessible Public RightsofWay: Planning and Designing for Alterations, The Americans with Disabilities Act Accessibility Guidelines for Buildings and Facilities, National Menu of Best Management Practices (BMPs) for Stormwater Management, Active Design Guidelines: Promoting Physical Activity and Health in Design, High Performance Infrastructure Guidelines: Best Practices for the Public RightofWay, Standards for Green Infrastructure (DEP: 2017), ProcedureGoverning Limited Survey for Green Infrastructure, Procedure Governing Limited Geotechnical Investigation for Right-of-Way Green Infrastructure Practices, PlaNYC Sustainable Stormwater Management Plan, Specifications for Traffic Signals and Intelligent Transportation Systems Construction and Equipment, Instructions for Filing Plans and Guidelines for the Design of Sidewalks, Curbs, Roadways and Other Infrastructure Components, Select Bus Service Design Guidelines: Update, El-Space Toolkit: Strategies for Reclaiming Sites Beneath Elevated Transportation Infrastructure, Version 1.0, Park Design for the 21st Century: High Performance Landscape Guidelines, Native Planting Species Guide for New York City, Inclusive Design Guidelines: New York City, New York State Stormwater Management Design Manual, San Francisco Better Streets PlanDraft for Public Review, Smart Transportation Guidebook: Planning and Designing Highways and Streets that Support Sustainable and Livable Communities, New York State Environmental Conservation Law (ECL), New York State Vehicle and Traffic Law (VTL), Department of Citywide Administrative Services (Chapter 35), Department of Consumer Affairs (Chapter 64), Department of Design and Construction (Chapter 55), Department of Environmental Protection (Chapter 57), Department of Parks and Recreation (Chapter 21), Department of Small Business Services (Chapter 56), Department of Transportation (Chapter 71), Franchises, Revocable Consents, and Concessions (Chapter 14), Landmarks Preservation Commission (Chapter 74), Public Design Commission/Art Commission (Chapter 37), Contracts, Purchases and Franchises (Title 6), Environmental Protection and Utilities (Title 24), Department of Citywide Administrative Services (Title 55), Department of Environmental Protection (Title 15), Rules Governing the Construction of Private Sewers, Rules Governing the Use of the Water Supply, Department of Parks and Recreation (Title 56), Department of Small Business Services (Title 66), Franchise and Concession Review Committee (Title 12), Landmarks Preservation Commission (Title 63), Public Design Commission/Art Commission (Title 57), Rules of the City of New York (Title 43 and 62), U.S. Traffic Calming Manual (American Planning Association & American Society of Civil Engineers: 2009), Under the Elevated: Reclaiming Space, Connecting Communities (DOT and Design Trust for Public Space: 2015).
Yubran Luna Wiki,
African Hair Salons Near Me,
Michael Joshua Levine,
Bill Murray On Harold Ramis' Death,
Does Seabourn Include Airfare,
Articles N