vdot soils and aggregate compaction pdf

SECTION 014500 QUALITY CONTROL PART 1 GENERAL 1.01 RELATED REQUIREMENTS A. 0 12) How long after installation is complete can the video inspection can be done? Currently VDOT certified or Mid Atlantic Regional Technician Program (MARTCP) in the following disciplines: - Expected VDOT Certifications Soil and Aggregate Field Compaction Asphalt Field Hydraulic Cement Concrete Field Pavement Marking Flagger Certification Certification & Issuing Agency Soil and Aggregate Compaction - VDOT or NICET LEVEL II* The values are often affected by varying percentages of large aggregate which consultants and contractors do not usually put into consideration. TABLE OF CONTENTS. If the inspection is to be conducted with a video camera, the video camera shall have fully articulating lenses that will provide a 360 degree inspection of the pipe/culvert, including each joint and any deficient areas of the pipe/culvert, as well as a means to measure deformations/deflections of the pipe (items such as a laser range finder or other appropriate device for taking such measurements as specified herein and approved by the Engineer). bKjL,gBZqa>,\w Contractor shall ensure that all permits are obtained prior to any construction. The mandrel shall be pulled through the pipe or culvert by hand with a rope or cable. 794 (d), please call 800-367-7623. Inspection is performed in accordance with VTM v1.0 Chapter 4 18, 19 1) What should be located before starting to dig? STEPS TO CONSTRUCTING A MOISTURE-RESISTANT FOUNDATION SOURCES OF MOISTURE IN NEW CONSTRUCTION. The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified. VDOT Materials Certification Schools. Senior Transportation Construction Inspector to join us in VDOT's Northern Virginia to inspect all phases of construction on highway construction and maintenance projects.To oversee, monitors . Shop drawings, 6.01 SCOPE The work covered by this section of the specifications consists of the furnishing of all plant, labor, materials, equipment and supervision and performing all operations involved in the construction, SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. Larry Ritchie, SECTION 6000 - EXCAVATION, TRENCHING AND BACKFILLING (Pipeline Construction), Table 4.9 Storm Drain Inlet Protetion Applicable for, INSTALLATION GUIDE. When standing water is in pipe foundation area, No. Some links may require the Adobe Reader. PDF 6 - Section 4 - Construction and Inspections - Henrico County, Virginia A compacted soil has a reduced rate of both water infiltration and drainage. How far should the hammer fall?, What are the moisture and density content corresponding to the peak of the curve . VDOT Materials Certification Schools - Business - Virginia Soils & Aggregate CCWA $ 350.00 $ 250.00 Handson proficiency will be scheduled upon . + (12 in. 296 0 obj <> endobj ACI Concrete. %%EOF LD Instructional and Informational Memoranda. What term refers to the texture and firmness of a soil? Bethel Township Municipal Authority (BTMA) RESIDENTIAL SEWER CONNECTION MANUAL. Where appropriate, SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. SECTION 02530 STORM DRAINAGE STRUCTURES. The goal shall be to collect, C PROJECT ESTIMATE ASSUMPTIONS AND EXCLUSIONS In support of the alternatives development process, preliminary cost estimates were prepared for each of the three Candidate Build Alternatives. Culvert Profile. Web Policy / Privacy Statement / WAI Compliance / Email Safety / Site Map, APD Instructional and Informational Memoranda, Minimum Requirements for Quality Assurance and Quality Control on Design Build and P3 Projects, AASHTOWare Project Preconstruction (AWP-P) Manual, Construction Instructional and Informational Memoranda, Instructional and Informational Memoranda, Alternative Intersection Informational Design Guides, LD Instructional and Informational Memoranda, PMO Instructional and Informational Memoranda, Pollution Prevention Field Guide for Construction Activities, Roadside Development Report Excel spreadsheet tool, Nutrient Management Plan for Construction Projects, Nutrient Management Plan for Roadside Management, VDOT BMP Maintenance Manual Appendix C - Plant Palette Tables, Materials Certification School Information, Guide to the Traffic Impact Analysis Regulations, Land Development Inspection Documentation Best Practices Manual, OD Instructional and Informational Memoranda, Guide Manual for Causes and Repair of Cracks in Bridge Deck, Traffic Calming Guide for Neighborhood Streets, Manual on Uniform Traffic Control Devices (MUTCD), TED Instructional and Informational Memoranda, VDOT Traffic Operations and Safety Analysis Manual (TOSAM), Instructional and informational memoranda, Manual for the Procurement and Management of Professional Services. Pipe Materials B. The joint consists of a tongue (male end) and groove (female end) with no defining areas for gasket material placement. = 12 lifts 3) 12 lifts 1 lift (skip first lift) = 11 lifts 4) 11lifts 4 (test every fourth compacted lift) = 2.75, round up to 3 tests in bottom 4 ft. of backfill Top 5 ft. of backfill x 3 lifts/ft. Conducts and/or observe and document test on soils, asphalt, concrete, aggregates, bituminous products, metal products and industrial coatings. Consistency refers to the texture and firmness of a soil. endobj If it is a routine entrance, or crossover pipe 12 to 30 in diameter, that is to be installed under fills 15 feet or less in height, no exploration is needed. Soiltight joints provide protection against infiltration of backfill material containing high percentage of coarse grain soils, and are influenced by the size of the opening (maximum dimension normal to the direction that the soil may infiltrate) and the length of the channel (length of the path along which the soil may infiltrate). If you wish to receive this content in an accessible format per Section 508 of the federal Rehabilitation Act, 29 U.S.C. If you wish to receive this content in an accessible format per Section 508 of the federal Rehabilitation Act, 29 U.S.C. Figure 4.1: Precast Concrete Pipe 2016v1.0 Chapter 4 1, 2 BASIC PIPE AND SOIL CONCEPTS The type of pipe selected for a particular application depends on many factors. PDF SPEEDY MOISTURE TEST Equipment Needed: Complete speedy kit, No. 4 sieve %%EOF excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Dense graded aggregates are used in pavement to give the structure more strength. AASHTO T180 The Moisture Density Relations of Soils using a 10-pound Rammer and an 18-inch drop. Other methods of stabilization, such as geo fabrics may be appropriate based on the engineer s judgment. = 15 lifts 5) 15 ifts 2 (one test every other lift) = 7.5, round up to 8 tests in the top 5 ft. of backfill 6) Total tests required = (Number of test below 5 ft.) + (Number of test above 5 ft.) 7) = 11 tests required (minimum) NOTE: Compaction Tests are required on stone backfill (Class I backfill and bedding material); consult the District Materials Division for Maximum Dry Density and Optimum Moisture Content targets for the specific material being used. 35 terms. SANITARY SEWER SPECIFICATIONS OCTOBER 2003 HARVEST-MONROVIA WATER, SEWER, AND FIRE PROTECTION AUTHORITY SECTION 1.00 1.10 Purpose The purpose of this document is to assemble the sewer specifications, policies, SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST For permanent structures per Delaware SCS Pond Code 378 and Delaware Sediment and Stormwater Regulations KEY PROJECT INFORMATION Item meets standard, LS 2540 SEWER LATERALS AND INSPECTION TEES A. The top few inches should be slightly yielding (loose) and fill the corrugations. This work consists of constructing storm sewers of the size and class required, including excavation, bedding, and backfill. If you have questions, please provide us with the course title and number when e-mailing or calling. These guidelines are applicable to the locating, marking, SECTION 5 - STORM DRAINAGE 5.01 Design Storm drainage facilities shall be designed in accordance with the goals and guidelines set forth in the Unified Development Ordinance. "Understanding soils is the key to becoming a well-rounded special inspector. Place sample in container and weigh. This work shall consist of providing pipe or pipe arch of the diameter or shape designated, laid upon a firm bed and backfilled as specified. Repair of service laterals located, Storm Sewer Trenchless Upgrade Alternatives and Recommendations Background Approximately 1,930 feet of the 40-inch and 42-inch CMP storm sewer pipe from manhole M22 to manhole M12 will be evaluated for, SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795) Note: This guide specification for U.S. applications describes construction of permeable interlocking concrete, REINFORCED CONCRETE PIPE PRE INSTALLATION INSPECTION & REPAIR MANUAL Kentucky Transportation Cabinet Kentucky Department of Highways Division of Materials 1227 Wilkinson Boulevard Frankfort, KY 40601 (502), Design Guide Basis of Design This section applies to the design and installation of earthwork and backfill. This section includes all labor, materials, equipment, and incidentals required and installation of Polyvinyl Chloride, STANDARD SPECIFICATIONS SECTION 03461 PRECAST REINFORCED CONCRETE MANHOLES AND MANHOLE BASES PART 1 - GENERAL A. For positive projection embankment installations, the embankment material should be placed and compacted to a minimum of one foot above the pipe and the trench excavated into the embankment. Wallace Montgomery hiring Inspector in Vienna, Virginia, United States %PDF-1.5 % Walls that carry extra, TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe TN 5.14 February 2010 Introduction It may be at times necessary, in an aging infrastructure, to rehabilitate drainage and sanitary lines, SECTION 33 41 00 REINFORCED CONCRETE PIPE PART 1 GENERAL 1.01 SECTION INCLUDES A. hb```f````2X@( [ $ The current deadline to have Soils and Aggregate Proficiency exams completed by is . back to courses page. True or false: Open graded aggregates are used in pavement to give the structure more strength. 55 terms. x 12 in./ft. Materials Overview for Business Transformation Office. Public Involvement Manual. Place container on stove or hot plate. This section covers the installation and testing of all sewer pipe furnished under the following specification sections: Concrete, SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION 1. Students must bring valid ID & attend class in order to test. PDF Appendix D - Virginia Test Methods (REVISED) 2016v1.0 Chapter 4 2, 3 Structural System Structural System Figure 4.2a: Reinforced Concrete Figure 4.2b: Flexible Pipe Culverts are generally designed for the loads they must carry after construction is completed. The function of the pipe, the soil type present in the trench, the depth of the pipe can all influence the type of pipe selected. Links may open in a new window. 1) Metal pipe gauge: Examples 12, 14, 16 2) Metal pipe corrugation dimensions: Examples 2 2/3 x ; 3 x 1 3) Concrete pipe strength: Examples Class III, IV or V 4) ph and Resistivity needs to be known by designer 2016v1.0 Chapter 4 5, 6 5) Maximum height of cover: Maximum height for each type of pipe must be given Compare information from drainage summary with maximum cover chart for pipe to be used Check standards for minimum height of cover Measuring Metal Pipe Corrugation example 3 x 2 3 2 Examples of concrete pipe stamp: They typically include manufactured date, diameter, pipe type, class, place of manufacturing. ]1YW'; q=A D0Yf BD0A8 Dh s @!2au28!w)#Nb=` L *w @y7![RYT6 Ke`riO05 ~z These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions. PurRoses 1. Municode Library 308 0 obj <>stream Bierolson. As a reminder, all certification courses are available either online or through a self-study option at the respective community colleges. 5) Open only as much trench as can be safely maintained by available equipment. VDOT: Soils and Aggregate Compaction. CATCH BASINS 7-3 7.4. ), Index. Your one-stop source for VDOT maps, data and project info. Pipe openings in precast drainage units shall not exceed the outside cross sectional dimensions of the pipes by more than a total of 8 inches regardless of the placement of the pipe, their angles of intersection, or shapes of the pipes. Trenching, Backfilling and Compacting: 02223, DRAINAGE MATS For Vertical: Flow 15-P For Horizontal: Flow 18-H, City of West Linn Public Works Standard Construction Specifications. PDF 02210 - TRENCHING, BACKFILLING AND COMPACTION OF UTILITIES - Lynchburg Alternative Project Delivery | Construction| Cost Estimation Office| Local Assistance |Location and Design | Maintenance |Materials |Office of Land Use | Operations | Project Management Office | Right of Way/Utilities | Structure and Bridge |Traffic Engineering | Transportation and Mobility Planning. suzanna_gevorgyan. Sign, fax and printable from PC, iPad, tablet or mobile with pdfFiller Instantly. protection. Having one of these functions without the other is worthless. Product data for drainage piping specialties. The foundation is to be explored below the bottom of the excavation to determine the type and condition of the foundation. The trench s dimensions and location are typically 1 foot wide and 2 to 4 inches below the subgrade and adjacent to the pavement edge. The gradation is the distribution of various particle sizes within the material. At the engineer of record's. Description 200-2 201 GENERAL 200-2 201.1 SPECIFICATIONS 200-2 201.2 CONNECTION TO EXISTING FACILITIES 200-3 202 MATERIALS 200-3 202.1 PIPES 200-4, VIDEO INSPECTION AND LASER DEFLECTION TESTING FOR POST CONSTRUCTION QC/QA SPECIFICATIONS AND MAINTENANCE INSPECTIONS BY JOHN FLECKENSTEIN PIPELINE AND DRAINAGE CONSULTANTS INTRODUCTION History Of Post, 601.1 601.2(a) SECTION 600 INCIDENTAL CONSTRUCTION SECTION 601 PIPE CULVERTS 601.1 DESCRIPTION This work is construction or reconstruction, inspection, and cleaning of pipe culverts; including subsurface, Model Specification 509 DRISCOPLEX 4200 and DRISCOPLEX 4300 Gravity Flow Sanitary Sewer The user may choose to adopt part or all of this Model Specification; however, the user should ensure that all parts, STANDARD SPECIFICATIONS SECTION 02701 INSTALLATION OF GRAVITY SEWER PIPELINES PART 1 - GENERAL A. CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 Precast Concrete Pipe 10.1.1 General This section covers material requirements, DIVISION 4300 STORM DRAINAGE SECTION 4305 STORM SEWER PART 1 - GENERAL 1.01 SCOPE This section covers the construction of storm sewers for the collection and transport of stormwater runoff. (500 grams) of soil. 2016v1.0 Chapter 4 16, 17 PAVEMENT DRAINS Pavement subsurface drainage is essential in obtaining a well performing pavement, whether it is flexible, rigid or composite. Care must be exercised to ensure placement and compaction of the embedment material in the haunches. Excavate Trench Proper trench widths will allow for proper compaction alongside the pipe. Haunching material may be Class 1 and must be placed and compacted in 6 inch loose/4 inch compacted maximum lifts, compacted to 95 percent standard proctor density. This course includes downloadable resources including a procedural outline and a pdf of the standard, instructional video content, interactive knowledge checks, and a self . What term describes that the particles in a mixture are sized so that they fill most of the voids and there is very little space in between soil or stone particles? Nebraska Department of Roads Drainage and Erosion Control Manual December 2011 Appendix C: Pipe Material Policy Page C-1 PIPE MATERIAL POLICY, SECTION 33 31 00.11 GRAVITY SANITARY SEWERS, DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL, SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS, San Antonio Water System Standard Specifications for Construction ITEM NO. All rights reserved. Fillable Online VDOT Soils and Aggregate Compaction Fax Email Print 7) Install the longitudinal perforated pipe at the bottom of the trench without bedding material. 4 0 obj Explore Foundation A stable foundation must be provided to ensure proper line and grade is maintained. Section Includes: Furnishing and installing nonreinforced concrete sewer pipe. Do not compact. Each layer of Class I and regular backfill material shall be compacted by rolling, tamping with mechanical rammers, or hand tamping with heavy metal tampers with a face of at least 25 square inches. container, large spoon, and 1.1 lbs. This zone contains the same select quality backfill material as in the haunch zone for flexible pipe. materials (soils, aggregate and asphalt) in the field, the Geotechnical firm shall be responsible for the continuous monitoring of the placement and compaction of aggregate base materials, asphalt concrete pavement and the placement and compaction of earthwork and backfill of trenches and structures to ensure compliance with the Specifications. The components of an underdrain system are: 1) Trench 2) Non woven geotextile drainage fabric 3) Perforated longitudinal pipe (min. VDOT Soils and Aggregate Compaction: Chapter 5 - Quizlet False. That list has been provided below: To learn about CHANGES up to 2018, please review the following: If youhave more in-depth questions, contact the Materials Certification Schools team: Email:MaterialsCertification@vdot.virginia.gov, Phone: J. R. Noble 804-731-9457 or Scott Manning 804-229-5118. For questions or concerns regarding MCS grades or certification status, contactus at MaterialsCertification@vdot.virginia.gov. Computer-based testing (CBT) allows NICET to extend several benefits to our customers: more flexible exam dates and appointment times; immediate scheduling and confirmation; and quicker exam scoring. Try Now! or structures. No. Hg`\CC t b Provisions. 1. VDOT Soils and Aggregate Compaction" Download Document. 19 terms. 71 terms. of the rammer used to compact the soil or soil and aggregate mixture in the mold and the number of layers placed into the compaction mold for compaction. SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS, Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering.

Man Killed In Farm Accident Today, Rick Macci And Serena Williams, Articles V

vdot soils and aggregate compaction pdf